Click here to return to the Wasilla Main Street Home Page
Project Documents

Adobe Acrobat Reader is required to download and view all PDFs on this site.

Rhabilitation Project Documents

Project Fact Sheet - 900kb


Public Meeting Documents

October 2015 Matsu Transportation Fair


April 8, 2015 Open House Documents


April 4, 2012 Open House


Environmental Assessment (EA) Documents

Signed Final EA - 25 MB

Signed Final EA Appendix B - 22.5 MB

Draft EA and Figures - 7.95 MB

Appendix A: Traffic Study Update 2012 - 7.85 MB

Appendix B: Agency and Public Coordination Records - 12 MB

Appendix C: Preliminary Right-of-Way Impacts Report - 1.4 MB

Appendix D: Technical Noise Report - 9.7 MB

Appendix E: Phase I Environmental Site Assessment - 5.5 MB


Related Documents

City of Wasilla Downtown Overlay District to the Related Documents - web link

Wasilla Main Street Traffic Study 2012 Update - 7.8 MB

2011 City of Wasilla Comprehensive Plan

The Comprehensive Plan identifies the Main Street-KGB Road-Yenlo Street couplet as a future transportation project that is needed.

2010-2013 Alaska Statewide Transportation Improvement Program (STIP) Revision 27 incorporated - 10 MB

The STIP calls for improvements at Wasilla-Fishhook Road/Main Street in the form of developing a one-way couplet in downtown Wasilla, bounded by Bogard Road to the north, where the KGB Road meets the Palmer-Wasilla Highway to the South and Yenlo/Talkeetna Streets to the east. The STIP indicates that the project is needed to “mitigate traffic congestion in downtown Wasilla, and is the initial effort to begin addressing the capacity and safety needs of the KGB corridor.

2007 Matanuska-Susitna Borough Long Range Transportation Plan - 17 MB

The LRTP calls for improvements at the KGB Road/railroad crossing.

Wasilla Main Street 2006 Traffic Study - 9 MB

Above Photo Banner: Wasilla Main Street, Courtesy of Michael Weller, AKDOT&PF Traffic Data Technician